OEM / ODM PROCESS

Five steps from your drawing to a loaded container

Drawings or samples both work. Standard lead time 30–35 days.

01

Requirement Brief

Share your target market, size range, certification needs and price band. Feasibility reply within 24 hours.

02

Design & Tooling

Drawings or physical samples both work. Moulds and first sample in 15–25 days, with 3D drawings for approval.

03

Sample Approval

Physical sample shipped for testing. Details refined, packing and shipping marks confirmed.

04

Mass Production

Standard lead time 30–35 days, with photo and video progress updates during production.

05

Inspection & Shipping

Third-party inspection supported. Export-grade packing, FCL/LCL from Shenzhen port.

Logo silk-printing · Custom manuals & cartons · Barcode & shipping mark services

Customization

Customization

  • Dimensions and well depth
  • Colour (gloss / matte / custom)
  • Drain and overflow position
  • Hardware and skirt options
  • Logo silk-printing and packaging
  • CNC sheet cutting
  • Vacuum forming
  • Fiberglass reinforcement
  • Steel frame support
  • 100% water test
  • Climate-controlled curing

Have a project in mind? Reply within 24 hours

Tell us your target market, size range and quantities. A sales engineer will come back with pricing, lead time and sample arrangements.